top of page
Poynette-Iron-Works (1).png

Square Receivers

Standard Construction
  • 3/16" Floor, length determined by capacity.
  • 12 Gauge sides, front, door & roof.
  • Tapered construction for easier dumping.
  • 3" x 5" x 3/16" structural tubing used for back channel and roof supports.
  • 10 Gauge formed, 2 bends, 5 3/4" W side channels are spaced 30" on centre for side & roof stiffeners.
  • Industrial enamel primer & paint.
  • Containers are delivered completely assembled & ready for use.
Understructure
  • 3" H Structural channel 18" on centre, with full 3" H structural channel apron.
  • Drain holes (through floor) under each channel.
  • 1 3/8" Thich solid bullnose inserted 2" into rails into 2" x 6" x 3/16" rails.
  • Rear rollers - 8" Dia. x 10" W with grease zerks & 1/2" thick wheel plate.
 
Doors
  • Constructed with 12 gauge door sheet and frames of 3" x 4" x 3/16" tubing uprights & horizontal cross-members. (no formed channel)
  • Extra heavy-duty door hinges with grease zerks. Each hinge assembly covers 1 linear foot of door surface.
  • Guide support latch side of door.
  • Door safety chain uses a heavy-duty quick snap with ratchet latch system.
  • Sealed Doors & Sealed Charge Opening doors available upon request.
  • Pinning Tunnels & Bars are available upon request.
 
Hook Styles
  • Cable-1 3/4" cable hook with 3/4" thick plate & 4" Dia. x 6" W front rollers with grease zerks & 1/2" thick support.
  • Hook - 2" x 6" x 3/16" A-frame with 2 1/2" Dia. pin/bar & 5/8" thick hook plates.
  • Deadlift
Paint Color Chart.jpg
FME 60 Years of Excellence.png
bottom of page